Project Description
Full refurbishment of Edinburgh Leisure’s 120-year-old Leith Victoria Swim Centre. Located just off Great Junction Street in Leith, the original Victoria Leith Baths were opened in 1899. The works to this building included minor structural alterations, new partitions, new finishes throughout, Mechanical and Electrical Alterations.
Our Role / Scope
Doig+Smith’s role included cost planning, preparation and issue of tender documents, value engineering, agreeing variations, preparing and issuing valuations, cost reports and agreement of the final account.
Benefits To Client
Cost Management: Cost management, change control and value engineering are vital from the outset to ensure the budget is constantly maintained. By successfully controlling and understanding the costs on this project Doig+Smith are able to quickly identify areas where costs could be reduced without impacting the design intent.